Tuesday, 17 September 2019

Call Me Back

General Motors

Virtual fitting of a new piping system

At General Motors Belgium, a new piping system was implemented during a plant shutdown.

To prevent any problems during implementation the existing situation was scanned and compared with the prepared new piping system. In other words ‘the pipe had to fit perfectly’! The scans proofed that the new segment would fit accurately and it was installed smoothly.

   

Production Industry | Process Industry | Architecture | Research